2005
Electrification of Kabarore : BURUNDI Line construction of 18 km MV 30kV and 3 km LV

2006
Line Construction of 30kV MV for supplying MWUMBA Water Pumping Station: BURUNDI

2007
110 KV transmission rehabilitation Bujumbura-Bubanza 30km in Burundi

2008
Construction of 21 Econet Telecoms site in BURUNDI

2009
Rehabilitation of Line 30km MV 30kV of Jenda-Tora, Matana BURUNDI

2010-2011
Electrification of Nkombo island in CYANGUGU on metallic poles and tower, 14 Km MV 30kV and 22km LV: Electrification of RWAMAGANA 10Km MV and 11 km LV:

2012
Manufacture, Supply, Installation, Testing, Commissioning and Maintenance of photovoltaic power-supply system for 246 secondary schools in Uganda

2012
Survey and study for electrical line RUSUMO – RUKOMO MV and LV 9 km Survey, study and construction for Public lights ( NYAMATA BUGESERA) Supply of public lights materials Construction of public lights 9.2 Km

2013
Rehabilitation of BUTARE electrification network, Upgrade of2lkm electrical network 6.6kv/0.4kV to 30kv/0.4kV in order to reduce loss off energy: Installation of 21 transformers Installation of21 RMU Installation of 21 L V cabinet 400V Installation of22km of30kV cable (3X185mm ) Construction of21 RMU houses Connection to existing network

2014
Installation and supplying medium transmission line and low voltage distribution & substation for 24 telecom sites for UCOM in Burundi

2015
Kobero border electrification

2016
Installation Underground Low Voltage and Medium Voltage and Service connections in Burera, musanze and Gakenke districts, northern province of Rwanda Lot2

2017
Installation of Low & Medium Voltage and Service Connections in Kayonza, Ngoma, Kirihe District- Eastern Province

2017
Installation of Low & Medium Voltage and Service Connections in Kayonza, Ngoma, Kirihe District- Eastern Province

2019
Construction of Multi CKT 30kV tower Line Gikondo to KBC ( Including Design, Supply, Installation) Kigali Rwanda

2020
Construction of220/l 10/30kV Substation – Miyinga – Burundi (Civil Work)

2021
Testing and Commissioning of 220 kV Rusomo – Gitega TL line

2022
Construction of 110kV Double Circuit line – Kabu 16 HPP to Buganda

2023
Construction of 220 kV Single Circuit Kamanyola – Bujumbura Transmission Line

2024
Installation of MV line, LV line and associated Double pole mounted transformers, providing consumer meter connections, street light works and associated civil & electrical works in Gambia.