ERTEC Burundi Ltd
Installation of low voltage on wooden poles, twist cable and overhead cable

Installation of LV and public lightening with metallic poles Kamenge zone (Burundi)

Installation of MV with wooden poles Kabarore (BURUNDI)
Empowering Communities Through Infrastructure Since 2005
Burundi is where ERTEC LTD was born. Since our foundation, we have proudly delivered major projects such as rural electrification (Kabarore, Kamenge, Jenda-Tora), MV and LV transmission line construction, and GSM telecom site deployments for major operators like Econet and Africell.
Kamenge -Mirango (Burundi)



Key Achievements:
- Electrification of 11 Community Colleges.
- 60km low-voltage network rehabilitation in Kamenge Zone.
- Construction of 21 telecom sites across the country.
- Installation of public lighting and fiber optics networks.
2023
Kigoma-Gitega 220kV Transmission Line
Ongoing
Transrail-Hanbaek Consortium/ REGIDESO
Construction of 220 kV Single Circuit Gitega – Gisagara TL Line
Ongoing
Transreal–Regideso
Construction of 110kV Single Circuit JIJI – Mulembwe Transmission Line
Ongoing
KEC/REGIDESO
Construction of 2.8km, 110kV Single Circuit under Ground Cable Line
Ongoing
KEC/REGIDESO
Construction of 220 kV Single Circuit Kamanyola – Bujumbura Transmission Line
Ongoing
KEC/REGIDESO
2x10MW Kabu-16 Hydro Electric Project, 110kV D/C Transmission Line (LILO)
13 months
Angelique International Ltd/ REGIDESO
2022
Construction of HV/MV Lines associated with the hydroelectric devlopment of JIJI and MULEMBWE OF 110kV Under Ground cable work, Ligne 220/110kV Poste KabeziPost RN1.
12 months
KEC/REGIDESO
2021
Testing and Commissioning of 220 kV Rusomo – Gitega TL line
6 days
KEC/REGIDESO
2020
Foundation Erection stringing work of220kV – Rusomo – Gitega Transmission Line –Burundi
18 Months
KEC/Rgideso
Construction of220/l 10/30kV Substation – Miyinga – Burundi (Civil Work)
6 Months
KPTU/RegideSO
2015
Installation of Transmission Line substation switchgear Protection wiring for BAKRESA ( Azam ) Factory-BURUNDI
10 Months
BAKRESA (Azam) Group
Kobero border electrification
10 Months
Trade mark/CCECC/ BURUNDI
2014
Installation and supplying medium transmission line and low voltage distribution & substation for 24 telecom sites for UCOM in Burundi
12 Months
UCOM
2013
Electrification of Econet sites (20 sites) Electrification of LEO sites Electrification of CARAMA Area (Bujumbura Town)
6 Months
ECONET WIRELESS
Electrification of Econet sites (20 sites) Electrification of LEO sites Electrification of CARAMA Area (Bujumbura Town)
6 Months
ECONET WIRELESS
2009
Construction of 20 sites of Africell Burundi under ALCATEL FRANCE
12 months
ALCATEL FRANCE/ AFRICELL BURUNDI
Rehabilitation of line 27 km MV 30kV SN EL-RANDAVER RUNDI : BURUNDI
6 Months
REGIDESO
Rehabilitation of Line 30km MV 30kV of Jenda-Tora, Matana BURUNDI
6 Months
REGIDESO
2008
Construction of 21 Econet Telecoms site in BURUNDI
12 Months
ZTE
2007
110 KV transmission rehabilitation Bujumbura-Bubanza 30km in Burundi
4 Months
REGIDESO
2006
Rehabilitation of KAMENGE Zone: BURUNDl, 60km LV and public light
4 Months
REGIDESO
Line Construction of 30kV MV for supplying MWUMBA Water Pumping Station: BURUNDI
3 Months
CICR
2005
Electrification of 11 Community Colleges : BURUNDI
3 Months
Project CRE
Supply and Installation of 1.5km MV 30kV line and 500m LV lines withWoodenPoles: BURUNDI
3 Months
Eveche de Gitega
Electrification of Kabarore : BURUNDI Line construction of 18 km MV 30kV and 3 km LV
6 Months
Project CRE
Current Focus in Burundi
- High voltage line construction.
- Substation installation and upgrades.
- Solar energy and water infrastructure projects.