ERTEC Rwanda Ltd
Headquarter
Public lights of Nyamata , Bugesera District



Fibre Optic Construction
Accelerating Smart Infrastructure for a Sustainable Future
In Rwanda, ERTEC LTD has played a significant role in expanding electrical, water, and telecom networks. From electrifying remote islands like Nkombo to installing fiber optic transmission lines across districts like Gicumbi, Nyagatare, and Kayonza.
Installation of metallic Poles at Rusizi and Nyagasambu (Rwanda)



Key Achievements:
- Electrification of Nkombo Island (14km MV, 22km LV lines).
- Fiber optic cable projects across key provinces
- Construction of Gikondo–KBC multi-circuit 30kV transmission lines.
- Public lighting development in Nyamata, Bugesera District.
2023
Construction of 220 kV Single Circuit Gitega – Gisagara TL Line
Ongoing
Transreal–Regideso
2022
SCADA EMS/ADMS for the Rwandan grid network
Ongoing
GE/REG-EDCL
2021
Construction of 220Kv Rusomo – Gitega TL line (Rwanda Part)
2 Month
KEC/REGIDESO
Testing and Commissioning of 220 kV Rusomo – Gitega TL line
6 days
KEC/REGIDESO
2020
Plant Design, Supply and installation, Procurement of 15kV Network Strengthening (lot 2: Plant Design, Supply and Installation of Materials for the Construction of 15kV Four Circuits Overhead Line)
12 Months
Ningbo Sanxing Smart Electric Co, Ltd / EUCL
2019
Construction of Multi CKT 30kV tower Line Gikondo to KBC ( Including Design, Supply, Installation) Kigali Rwanda
18 Months
Nigmbo/EUCL
2017
Installation of Low & Medium Voltage and Service Connections RUSIZI, NYAMSHKE District – Western Province
8 Months
REG/OIA
Installation of Low & Medium Voltage and Service Connections in Kayonza, Ngoma, Kirihe District- Eastern Province
12 Months
REG/NCC
2016
Supply & Installation 30kV Line , Transformer for Water pump Station at GAKENKE
3 Months
GAKENKE District/ WASAC
Supply & Installation 30kV Line , Transformer for Water pump Station at RUNDA Sector
3 Months
Kamonyi District/ WASAC
Installation Underground Low Voltage and Medium Voltage and Service connections in Burera, musanze and Gakenke districts, northern province of Rwanda Lot2
12 Months
REG/SPENCO
2014
Installation ofLV network in Karongi
3 Months
Ewsa/Spencon
2013
SURVEY & Installation Smart wireless Postpaid Meters – Western & Northern Province
3 Months
REG/HUAWEI
Smart wireless Postpaid Meters Installation
3 Months
REG/HUAWEI
Supply and Installation of telecommunication tower Equipment for RBA
6 Months
Broadcasting Agency
MUYUMBU and Mbandazi electrification I0KM MT 30kV and 10 km low voltage
3 Months
JICA/EWSA/TAKAOKA
Rehabilitation of BUTARE electrification network, Upgrade of2lkm electrical network 6.6kv/0.4kV to 30kv/0.4kV in order to reduce loss off energy: Installation of 21 transformers Installation of21 RMU Installation of 21 L V cabinet 400V Installation of22km of30kV cable (3X185mm ) Construction of21 RMU houses Connection to existing network
6 Months
JICA/EWSA/TAKAOKA
2012
Survey and study for electrical line RUSUMO – RUKOMO MV and LV 9 km Survey, study and construction for Public lights ( NYAMATA BUGESERA) Supply of public lights materials Construction of public lights 9.2 Km
2 Months
REGRO/POWER/ ESF/Minfra
2010-2011
Line construction of CYIMBILI-KAYOVE
12 Months
ANGLO BELGIAN CORPORATION/CTB /EWSA
Electrification of Nkombo island in CYANGUGU on metallic poles and tower, 14 Km MV 30kV and 22km LV: Electrification of RWAMAGANA 10Km MV and 11 km LV
12 Months
HOLLEY/ EWSA
2009
Line Construction of 1.2 km 30kV MV at MURUNDA hydropower plant in Rutsiro District : RWANDA
3 months
REPRO/MINENFRA
Current Focus in Rwanda
- SCADA system development for the national grid.
- Renewable energy and smart grid projects.
- Telecom tower installations and fiber optic expansion.


Contact us
Rwanda,
Kigali,
Contact : Dieudonné HATUNGIMANA
Email: dieudonne@Erteclimited.com
Mobile: +250 783 735 001
Contact: Umutesi Divine
Email: divine@erteclimited.com
Mobile: +250 785 802 009