Supply Electrical Component and Electrical infrastructure Project

ERTEC LTD specializes in the supply of high-quality electrical components and the execution of turnkey electrical infrastructure projects. Our expertise spans medium and low voltage line construction, electrification of rural and urban areas, substation installation, smart metering systems, and grid rehabilitation. With a proven track record across multiple African countries, we deliver reliable and sustainable energy solutions that power communities and industries.

2024

Under Ground Cabling Trench Construction, Installation and Related Works for Cameroon Projects. Assembly of the interconnection line ST 90kV 225kV and 90kV high voltage lines around Douala.

Ongoing

TATA PROJECTS LTD/SONATREL

Installation of MV line, LV line and associated Double pole mounted transformers, providing consumer meter connections, street light works and associated civil & electrical works in Gambia.

Ongoing

KEI industries limited (KEI)/National Water &Electricity Company (NAWEC)

2023

Installation, testing and commissioning of Tunduru (220/33kV, 2x60 MVA Tunduru substation and 220kV bay extension at Songea substation)

Ongoing

KPIL/TANESCO

Kigoma-Gitega 220kV Transmission Line

Ongoing

Transrail-Hanbaek Consortium/ REGIDESO

Construction of MV & LV line Ruyigi – Karusi & Cyanguzu

Ongoing

East India –Regideso

Construction of 220 kV Single Circuit Gitega – Gisagara TL Line

Ongoing

Transreal–Regideso

Construction of 110kV Single Circuit JIJI – Mulembwe Transmission Line

Ongoing

KEC/REGIDESO

Construction of 2.8km, 110kV Single Circuit under Ground Cable Line

Ongoing

KEC/REGIDESO

Construction of 220 kV Single Circuit Kamanyola – Bujumbura Transmission Line

Ongoing

KEC/REGIDESO

2022

SCADA EMS/ADMS for the Rwandan grid network

Ongoing

GE/REG-EDCL

Construction of HV/MV Lines associated with the hydroelectric devlopment of JIJI and MULEMBWE OF 110kV Under Ground cable work, Ligne 220/110kV Poste KabeziPost RN1.

12 months

KEC/REGIDESO

2021

Construction of 220Kv Rusomo – Gitega TL line (Rwanda Part)

2 Months

KEC/REGIDESO

Testing and Commissioning of 220 kV Rusomo – Gitega TL line

6 days

KEC/REGIDESO

2020

Plant Design, Supply and installation, Procurement of 15kV Network Strengthening (lot 2: Plant Design, Supply and Installation of Materials for the Construction of 15kV Four Circuits Overhead Line)

12 Months

Ningbo Sanxing Smart Electric Co, Ltd / EUCL

Supply of Wooden Pole

3 Months

Gupta Power/ EDCL

Foundation and Tower Erection work of220kV line Rusomo – Sango line

8 Months

Sterling Wilson / EDCL

Construction of220/l 10/30kV Substation – Miyinga – Burundi (Civil Work)

6 Months

KPTU/RegideSO

Foundation Erection stringing work of220kV – Rusomo – Gitega Transmission Line –Burundi

18 Months

KEC/Rgideso

2019

Construction of Multi CKT 30kV tower Line Gikondo to KBC ( Including Design, Supply, Installation) Kigali Rwanda

18 Months

Nigmbo/EUCL

2017

Installation Testing & Commissioning of2x52MV A, 132/88/33 kV chongwe substation – Zambia Installation Testing & Commissioning of Indore 33kV GIS switchboard at Liverpool Substation – Zambia Installation Testing & Commissioning of2x26MVA, 33/1 lkV Substation Makeni – Zambia Testing & Commissioning of Kabulonga Chelstone Melero L85 chongwe Town Chalala & Bonaventure 33/1 lkV substation & New Ndeke 66/1 lkV Substation –ZAMBIA

12 Months

EISEWEDY ELECTRICAL/ UZESCO

Tower Erection & Conductor & OPGW stringing for 330kV Line from Chambishi copper smelter to Muufulira substation Zambia Installation Testing & Commissioning of2x52MV A, 66/33kV Substation at Mwambashi in Kitwe – Zambia

12 Months

EISEWEDY ELECTRICAL/ UZESCO

Installation of Low & Medium Voltage and Service Connections RUSIZI, NYAMSHKE District – Western Province

8 Months

REG/OIA

Installation of Low & Medium Voltage and Service Connections in Kayonza, Ngoma, Kirihe District- Eastern Province

12 Months

REG/NCC

2016

Installation Underground Low Voltage and Medium Voltage and Service connections in Burera, musanze and Gakenke districts, northern province of Rwanda Lot2

12 Months

REG/SPENCON

2015

Installation Underground Low Voltage and Medium Voltage and Service connections in Burera, musanze and Gakenke districts, northern province of Rwanda Lot2

12 Months

REG/SPENCON

Installation of Transmission Line substation switchgear Protection wiring for BAKRESA ( Azam ) Factory-BURUNDI

10 Months

BAKRESA (Azam) Group

Copabelt electrification : Mponwe district: 19 km MV llKV line and 5 km of over head Low voltage distribution with three transformers of 100KVA,11KV/0.4KV

12 Months

REN/ZAMBIA

Kobero border electrification

10 Months

Trade mark/CCECC/ BURUNDI

2013

Electrification of Econet sites (20 sites) Electrification of LEO sites Electrification of CARAMA Area (Bujumbura Town)

6 Months

ECONET WIRELESS

MUYUMBU and Mbandazi electrification I0KM MT 30kV and 10 km low voltage

3 Months

JICA/EWSA/TAKAOKA

Rehabilitation of BUT ARE electrification network, Upgrade of2lkm electrical network 6.6kv/0.4kV to 30kv/0.4kV in order to reduce loss off energy: Installation of 21 transformers Installation of21 RMU Installation of 21 L V cabinet 400V Installation of22km of30kV cable (3X185mm ) Construction of21 RMU houses Connection to existing network

6 Months

JICA/EWSA/TAKAOKA

2012

Survey and study for electrical line RUSUMO – RUKOMO MV and LV 9 km Survey, study and construction for Public lights ( NYAMATA BUGESERA) Supply of public lights materials Construction of public lights 9.2 Km

12 Months

ANGLO BELGIAN CORPORATION/CTB /EWSA

2010-2011

Line construction of CYIMBILI-KAYOVE

12 Months

ANGLO BELGIAN CORPORATION/CTB /EWSA

Electrification of Nkombo island in CYANGUGU on metallic poles and tower, 14 Km MV 30kV and 22km LV: Electrification of RWAMAGANA 10Km MV and 11 km LV

12 Months

HOLLEY/ EWSA

2009

Line Construction of 1.2 km 30kV MV at MURUNDA hydropower plant in Rutsiro District : RWANDA

3 Months

REPRO/MINENFRA

Rehabilitation of Line 30km MV 30kV of Jenda-Tora, Matana BURUNDI

6 Months

REGIDESO

2006

Rehabilitation of KAMENGE Zone: BURUNDl, 60km LV and public light

4 Months

REGIDESO

Line Construction of 30kV MV for supplying MWUMBA Water Pumping Station: BURUNDI

3 months

CICR

2006

Rehabilitation of KAMENGE Zone: BURUNDl, 60km LV and public light

4 Months

REGIDESO

Line Construction of 30kV MV for supplying MWUMBA Water Pumping Station: BURUNDI

3 months

CICR

2005

Supply and Installation of 1.5km MV 30kV line and 500m LV lines withWoodenPoles: BURUNDI

3 Months

Eveche de Gitega

Electrification of Kabarore : BURUNDI Line construction of 18 km MV 30kV and 3 km LV

6 Months

Project CRE

Electrification of Kabarore : BURUNDI Line construction of 18 km MV 30kV and 3 km LV

6 Months

Project CRE